:Qualification: Diploma/ Degree in Survey Engineering, Surveyor's Certificate of Competency (issued by DGMS)Job PurposeResponsible for Preparation & Maintenance of all the Statutory Plans & all other records as required under CMR.
Ensure modern Instruments and software and Quantity survey of Mines stockyard for measurement.Job Context & Major ChallengesJob Context:
Amelia Coal Mine is located in the Main basin of Singrauli Coalfield, Singrauli District of Madhya Pradesh (~37 km from Singrauli City). The block has been allotted to THDC India Limited, a Mini Ratna Public Sector Undertaking (Joint Venture of NTPC Limited and Government of Uttar Pradesh). THDC has appointed Amelia Coal Mining Limited as their MDO. In FY2023, ACML has begun Overburden Removal and Coal Production. State of Art Technology utilized in Amelia Coal Mine is combination of shovels and dumpers and Surface Miners. Amelia Coal Mine is currently in the ramp-up phase with Peak Rated Capacity (PRC) of 5.6 Million Tonnes Per Annum. Scope of the MDO includes Access to Site, Finance, deploy HEMM, Operate and Maintain Mine, excavate and deliver coal; Construction and Maintain of Coal Handling Plant (CHP), infrastructure including Conveyor (Mine to Railway Siding), Railway Siding, Approach and Access Roads; Arrange Power Supply, Undertake Land Acquisition, R&R, obtain possession of land, procure and renew EC, FC, licenses, permits, etc.Major Challenges:
Some of the major challenges includes achieve and maintain peak coal production and overburden removal, ensure safe operation, maintain coal quality, shifting of Project PDFs, facilitate land acquisition, physical possession of land, implementation of R&R policy, construction, operation and maintenance of Coal Handling Plant (CHP), Coal Conveyor and Railway Siding, compliance with statutory norms, renewal/ amendment of statutory clearances, undertake progressive mine closure, facilitate smooth operation and comply with the requirements as per terms of contract with THDC, Contractors, Sub-Contractors, etc.Key Result Areas KRA (Accountabilities) (Max 1325 Characters) Supporting Actions (Max 1325 Characters)
KRA1 Measuring Monthly OB and Coal removal measurement with high degree of accuracy. Using modern Instruments and software and Quantity survey of Mines stockyard for measurement.
KRA2 Survey & Measurement Weekly Shovel and Dragline cut surveyWeekly coal mines stock and quarry coal survey. Regular Blast inventory survey.Weekly dump and haul road survey.Daily contractual cut survey.Weekly Plant coal stock measurement.
KRA3 Overburden Related Activities Surveying by 3D scanner for monitoring of Dragline working and mine OB & Coal production volume calculation.Measuring Monthly OB and Coal removal measurement with high degree of accuracy using modern Instruments and software and Quantity survey of Mines stockyard.
KRA4 Statutory Compliances Responsible for Preparation & Maintenance of all the Statutory Plans & all other records as required under CMR.
KRA5 Other activities Preparation of monthly working planAny other works assigned by surveyor In-charge or Colliery Manager from time to time.Layouts / Checking of Contractual & Departmental Dumping profile. Control deviation from the approved drawing
MNCJobsIndia.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.