:Job PurposeTo Monitor & review plant environment parameters, & facilitate their compliance as per Environment Management System standards & as per Government & statutory Acts, through effective liaison with Govt. agencies and plant people for smooth operation and functioning of the plant and to ensure conformance with all applicable environmental regulations and policies and to make synergy and strategy related to policy decisions of State Govt. to understand of various environment issues and their strategy.Job Context & Major ChallengesJob Context: UltraTech Cement Ltd. is the largest manufacturer of grey cement, Ready Mix Concrete (RMC) and white cement in India. The company has consolidated capacity of 138.39 Million Tons Per Annum (MTPA)* of grey cement. UltraTech Cement has 23 integrated plants, 1 clinkerisation plant, 29 grinding units and 8 bulk terminals.Baga Cement Works was acquired by UltraTech Cement Limited from erstwhile M/S Jaiprakash Associated Limited in the year 2017. Baga Cement Works is located at around 155 Km from Chandigarh, 67 km from Shimla and 37 km from Bilaspur (HP). The nearest National Highway is NH-88 which is 17 Km from the plant. The plant has 10,000 TPD clinker production capacity & 250/300 TPH OPC/PPC cement grinding capacity. The preheater consists of four strings, each with 6 stages of LP cyclones, with two pyroclones supplied by M/s KHD. This is a unique feature of this cement plant due to which the plant operates at lower heat and electrical energy. The preheater has a height of 155 mtrs, with top floor at 135 mtrs. The preheater has been constructed out of tubular steel structure.The Cement Plant is based on lime stone deposits in Baga - Bhalag hills which are adjacent to plant area. Limestone requirement of the plant is around 15000 TPD. For raw material grinding, two vertical roller mills of 420 TPH each have been installed with a C.F. Silo having a capacity of 24,000 MT.
The unit is equipped with state-of-the-art pollution control systems, and operating emission norms are much lower than the permissible standards of 30 mg/Nm3. Two continuous ambient air quality monitoring stations have been installed which are hooked up to CPCB and PCB and transmit real time data's. For emergency electrical power, 8 x 1800 KVA, DG sets have been installed.
The township for the plant is located near the plant and has a residential complex for 300 families. 10+2 school and 05 bed hospital has been built. For transporting clinker and cement from plant a fleet of about 4000 trucks have been engaged.
Major Challenges:
Ambient air due to climatic factor or manmade activities.
Co process of Hazardous waste (Solid and Mixed) Due to unavailability of MSDS.
Plastic recovery as responsibility of EPR under PWM rule-2016.
NOx emission and Porthole issue as per CEMS guideline in/at RABH stack.
Implementation density of the trees around 2500 plants per ha. In hilly terrain areas.Key Result Areas KRA (Accountabilities) (Max 1325 Characters) Supporting Actions (Max 1325 Characters)
KRA1 1. Strategy & Planning:
To coordinate with multiple stakeholders including Government authority for the completion and approval of projects. Taking lead to align the unit goals with Sustainability Goals related with Environment. Involve in the studying and developing of environment impact assessment report for cement plant, limestone mines and township.
MNCJobsIndia.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.