:Job PurposeMonitoring and analyzing plant system, processes & performance including monitoring of coal quality & consumption, identifying & implementing energy saving schemes and ensuring timely completion of SAP report along with information sharing with Technical & Commercial MIS dept.Job Context & Major ChallengesBirla Cellulosic is part of Group\xc3\x82s Pulp & Fibre Business, established in 1998 with latest state of the art technology comprising of DCS control and certain imported equipments. Post-expansion the production capacity has scaled up to 127750 TPA and is producing best quality of VSF in the group with consistency and at lowest cost of production, establishing benchmarks within the group. The Unit meets the requirement of fibre in both domestic and export market.Post-expansion, a 25 MW extraction mode captive power plant having interdependency with VSF operation is integrated with zero tripping tolerance.VSF falls under the category of highly polluting industry for water, air and land. Company is under consistent pressure to implement and achieve the desired pollution norms and continuous efforts are being made in maintaining consistency and to improve further to meet environmental requirements.
Major Challenges\xc3\x82 Implementation of energy saving suggestions & plant improvement projects and development of fresh proposal.
\xc3\x82 Performance monitoring and analysis of plant including monitoring and controlling of Coal quality & consumption.
\xc3\x82 Timely completion of CMIS, Directors report and report to Group CPP Services.Key Result Areas KRA (Accountabilities) (Max 1325 Characters) Supporting Actions (Max 1325 Characters)
KRA1 a. Performance monitoring and analysis - Continuous plant Performance monitoring and analysis.
KRA2 b. Daily & Monthly reports of energy centres - Completion of CMIS. - Completion of Steam and power reports.
- SAP & MIS.
KRA3 c. Reports pertaining to outside agencies - Director\xc3\x82s report, Group CPP services report, etc.
- Reports to CASH task force.
KRA4 d. Reduce Energy Cost - Ensuring implementation of energy saving suggestions, development of fresh proposal
- Monitoring and controlling Coal quality & consumption.
KRA5 e. Improvement Initiative - Ensuring implementation of improvement Projects
- Reduction in auxiliary power consumption
KRA6 f. Ensuring optimum utilization of raw materials & other inputs to minimize expenditure - Developing and implementing actions for eliminating root causes of leakages, spillages, wastage of raw materials and intermediate on a continuous basis.
KRA7 ISO Ensuring compliance to all applicable norms.
MNCJobsIndia.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.