1) Pre-construction Stage: Prepare the Design Brief in terms of function ability, cost, time, quality and safety Develop project control systems Finalization of project organization chart. Establishment of project communication and reporting system Preparation of works breakdown structure Preparation of Project Master Schedule with base line Preparation of Design / Drawings deliverables schedule Feedback on the Master Budget of the project Co-ordination and follow-up with Architect and other design consultants for their inputs To ident in and suggest consultants/designers for specialized requirements Lead project meetings as necessary for review of progress To set up ,track, monitor a design deliverable schedule Checking & verification of designer\'s submissions (design basis reports, value engineering, cost benefit analysis, drawings etc.) Cost control during all stages of design and design development Preparation of procurement plan Review of technical specifications and Bill of Quantities (BOQ) Monitoring the statutory approvals process by follow-ups with liaison consultants and reporting the progress. Conducting Pre-bid meetings and feedback for completeness of tender specifications and technical parameters. comparative statements & techno-commercial evaluation reports Submitting Weekly and Monthly progress reports 2) Construction Stage Full time supervision of All construction works / activities for the project On-site design co-ordination and issue of drawings / clarifications Organize approval to contractors shop drawings, product data sheets, samples, Refinement of works breakdown structure Monitoring the progress of work with the Master construction schedule Prior flagging of anticipated bottlenecks and analysis of its reasons Day to day correspondences including contractual issues Change order management for design changes and extra items Prepare QA/QC plan and Method Statement with the coordination of QA/QC Team Quality assurance and control to ensure conformance to drawings and specifications with the coordination of QA/QC Team Establish EHS plan (Environment, Health and Safety) with the coordination of Safety Team Issue GFC drawings to respective contractors and keep updated record issued. Scrutinize and check working drawings received from Architects /designer Organize Progress review meetings on weekly basis. Collect, review and maintain all the records of contractors\' daily progress reports. 3) Post-Construction Stage: Advice about probable date of Substantial Completion Preparing & addressing the schedule of defects / punch lists Provide assistance in Testing and commissioning of the facility Collection and integration of various O and M manuals, commissioning & test certificates Reconciliation and Certification of Final bills of contractors, suppliers, vendors and consultants Preparation of project close-out report including learning Collate and all As-built drawings Addressing any queries during defects liability period Co-ordination with the Contractors to rectify the defects during the defects liability period Candidate must have good communication skillsNote: Candidate must be willing to work at sites Job Types: Full-time, Permanent Pay: \xe2\x82\xb9600,000.00 - \xe2\x82\xb9750,000.00 per year Benefits:
Health insurance
Provident Fund
Schedule:
Day shift
Experience:
Ten: 3 years (Preferred)
Work Location: In person
Beware of fraud agents! do not pay money to get a job
MNCJobsIndia.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.