EQUIPMENT SupervisorLNT/ES/1052910
L&T Energy - HydrocarbonVizag, Andhra Pradesh
Posted On
15 Jun 2024
Required Experience
12 - 34 Years
Skills
Knowledge & Posting Location
EQUIPMENT MANAGEMENT
EQUIPMENT INSTALLATION
Minimum Qualification
B.TECH/B.E
DME
DIPLOMA
• Preparation of method statement for Static & Rotary Equipment installation, Packages installation, Column Internal & Critical lift.
• Preparation of Job Safety Analysis for Static & Rotary Equipment installation, Packages installation, Column Internal & Critical lift.
• Execution of Static Equipment Erection works like Exchanger, Column, Vessel , filter & Column Internals erection, alignment & grouting.
• Execution of Rotary Equipment Erection, Alignment and Pre commissioning like Pump, Blower, Compressor, EOT crane , alignment & grouting.
• Execution of Packages like Flue gas unit, CLO, LPG treatment, Air fin Cooler package, Waste heat Boiler, Cycle water packages installation & Mechanical clearance.
• Final alignment (with piping) of Rotary Equipment after piping loop hydrotest & flushing.
• Punch point liquidation & Format-III ( Mechanical Completion) raising for the Static, Rotary & Packages.
MNCJobsIndia.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.