Chief Track Technical Manager

Year    Virar, Maharashtra, India

Job Description


Our client is seeking a Chief Track Technical Manager to work on the Mumbai-Ahmedabad HSR project.Work Location: Virar, IndiaRequired Mobilization: June 2025The Project will connect Mumbai and Ahmedabad with a fully dedicated double-track HSR whose total length is approximately 500 km (Mumbai-Sabarmati: 506 km, Mumbai-Sabarmati Depot: 508 km). On the Mumbai side, the line will run through an underground tunnel across the Thane Creek to an underground station at Bandra Kurla Complex. On the Ahmedabad side, the line will run over viaducts to the stations at Vadodara, Ahmedabad, and Sabarmati, abutting on the existing Indian Railway stations for the convenience of the transfer of passengers between the stations. Basically, viaduct structures will be adopted. A total of 12 stations will be planned with three depots, at an average interval of 50-km.Job Requirements- Bachelor Degree holder of Engineering, Science, Technology or Agriculture- Total experience of 13 years or more- 2 years of experience in Shinkansen/HSR in relevant field

Rail Personnel

Beware of fraud agents! do not pay money to get a job

MNCJobsIndia.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.


Related Jobs

Job Detail

  • Job Id
    JD3557659
  • Industry
    Not mentioned
  • Total Positions
    1
  • Job Type:
    Full Time
  • Salary:
    Not mentioned
  • Employment Status
    Permanent
  • Job Location
    Virar, Maharashtra, India
  • Education
    Not mentioned
  • Experience
    Year